Factory Testing

The objective of testing is……
  • To ensure QUALITY
  • To ensure STANDARDS / CUSTOMER SATISFACTION
  • To ensure CUSTOMER PEACE OF MIND
  • To ensure PRODUCT IS FIT FOR ITS INTENDED USE

Routine Tests : Performed on all transformers

  • Winding Resistance
  • Ratio, Polarity and Phase Relation
  • Core Loss and Exciting Current
  • Load Loss and Impedance
  • Induced Potential
  • Applied Potential (Hi-Pot)
  • Production Line Impulse Test
  • Insulation Resistance
  • Insulation Power Factor
  • Leak (pressure) Test
Transformer testing with MSEDCL’s Engineer

Type Tests : Performed on each unique design

  • Full ANSI impulse Voltage Test
  • Temperature rise test
  • Short Circuit Test